Maritimo 52 – removal and replacement of new solid teak deck for the swim platform

ARTICLE BY - Author - Alexander Scholz October 12, 2019
Maritimo 52 – removal and replacement of new solid teak deck for the swim platform

The finished result with all the original accessories fitted back into position. What we had to start with wasn’t pretty. The deck fabricated and ready for installation. Installation process – midway. Still going. The finished result with all the original accessories fitted back into position. What we had to start with wasn’t pretty.

The deck fabricated and ready for installation. Installation process – midway. Still going. The finished result with all the original accessories fitted back into position. What we had to start with wasn’t pretty. The deck fabricated and ready for installation. Installation process – midway. Still going.

Author

Alexander is one of the most experienced and qualified captains in Western Australia. He has been involved in the marine industry for over 30 years in various professional capacities ranging from commercial shipping (oil, gas, chemical, bulk, roll on/roll off), private motor yachts and charter game fishing (Cairns โ€“ Sydney). He holds a Diploma of Applied Science โ€“ Nautical Science from Australian Maritime College and a Certificate III in National Marine Engineering from TAFE Western Australia. He also travels to the United States, Singapore, Thailand and South America to attend marine industry trade shows and tour prominent boat factories and accessory manufacturers to participate in training workshops. There is not much he cannot design, build, improve, organise or customise.

    Request a callback