Carribean 45 – Recaulking the Marine Deck 2000 with TDS.

The finished result with all the original accessories fitted back into position. What we had to start with wasn’t pretty. The deck fabricated and ready for installation. Installation process – midway. Still going. The finished result with all the original accessories fitted back into position. What we had to start with wasn’t pretty.
The deck fabricated and ready for installation. Installation process – midway. Still going. The finished result with all the original accessories fitted back into position. What we had to start with wasn’t pretty. The deck fabricated and ready for installation. Installation process – midway. Still going.